+902164698777
info@protekproje.com

PROJECTS

Highway, Motorway & Railway Design Works


NORTHERN MARMARA MOTORWAY

Odayeri-Pasakoy Section

Description of actual services provided in the assignment:

The Motorway Alignment, Roadside Facilities, Interchanges, Drainage,

Traffic Surveys & Traffic Signing and Road Marking Design,

Safety Equipment, Electrification and Lighting,  Landscape Design. The Final Bill of Quantities , Unit Price Descriptions and Technical Specifications.

• 22 Interchanges

• 102 Km. Motorway

• 25 km. Link Road

• 37 Viaduct

• 2 Motorway Tunnels

• 2 Railway Tunnels

• 2  Toll Plazas

• 5 Parking Areas

• 2 Maintenance Centers

29.May.2013 Northern Marmara Motorway Opening Ceremony, Mr. Binali Yıldırım, Minister of Transportation, describing the project on General Layout Plan.

26.August.2016 Northern Marmara Motorway Opening Ceremony


EXECUTED WORKS IN IRAQ

• ERBIL-ZAKHO MOTORWAY (182 KM.)

Description of actual services provided in the assignment:

Topographic Strip Mapping,
The Geotechnical Study inc. Borehole Drilling and Trial Pits,
The Motorway Alignment,
Tunnel, Roadside Facilities,
Interchanges,
Structural,
Drainage,
Traffic Surveys & Traffic Signing and Road Marking Design,
Safety Equipment,
Electrification and Lighting,
Landscape Design. The Final Bill of Quantities ,
Unit Price Descriptions and Technical Specifications.

• 11 Interchanges
• 1 Tunnel (2×2 Twin tube, 2295 m.)
• 9 Toll Plaza
• 12 Parking Area
• 3 Service Area
• 2 Maintenance Center
• 4 Viaduct (2775 m.)
• BASTORA VIADUCT L=448.20m
• IFRAZ VIADUCT L=927.962m
• KHAZIR VIADUCT L=748.20m
• ALOQA VIADUCT L=750m
• 18 River Bridge (838 m.)
• 31 Overpass (1370 m.)
• 11 Underpass (431 m.)
• 274 Box-Culverts


ERBIL RING ROAD (15.6 KM.)

Description of actual services provided in the assignment:
  • The project includes the Engineering & Design Works of 15.6 km. of outer ring road surrounding Erbil City.
  • The ring road is designed as (2×3) freeway with full control of access.
  • Detail Topographic Strip Mapping=298 ha.
  • Geotechnical Study incl. Borehole Drilling & Trial Pits; Highway Alignment Design=15.670 km.
  • 5 Interchanges
  • 9 Overpass Bridges   
  • 5 Underpass Bridges
  • 10 Culverts
  • 1 Diversion Canal,
  • Structural Design= 15297 m2
  • Drainage Design, Traffic Surveys & Traffic Signing and Road Marking Design
  • Landscape Design
  • Conceptual Lighting Design


KORA-SHAQLAWA-HARIR-QANDEEL HIGHWAY

Description of actual services provided in the assignment:

The KORA – SHAQLAWA – QANDEEL HIGHWAY forms one link planned to facilitate efficient road travel across Erbil to Iran Border. In order to maximize the expected benefits to users a consistently high design standard should apply throughout the route. The rote has been designed in three lots.The Kora-Shaqlawa Section is 9.2 km, Shaqlawa-Harir Junction Section is 13.3 km, and Harir Junction-Qandeel is 28.1 km long.

  • Topographic Strip Mapping
  • The Geotechnical Study inc. Borehole Drilling and Trial Pits
  • The Highway Alignment
  • Tunnel
  • Interchanges
  • Structural
  • Drainage
  • Traffic Signing and Marking
  • Safety Equipment
  • Electrification and Lighting. The Final Bill of Quantities
  • Unit Price Descriptions and Technical Specifications
  • 3 Interchanges
  • 9 Intersections
  • 2 Tunnel (2×2 Twin tube)
  • 2 Viaduct (2775 m.)
  • 8 River Bridge (838 m.)
  • 4 Overpass (1370 m.)
  • 3 Underpass (431 m.)
  • 84 Box-Culvert

ERBIL-ALTUNKOPRI HIGHWAY

Description of actual services provided in the assignment:

The project includes the Engineering & Design Works of 38.5 km (2×2) Highway Rehabilitation and Widening works. The Client attended for using the World Bank Fund saved for rehabilitation of this route, which has importance of connecting Erbil to Kirkuk. We carried out the both design and contract management works on behalf of the Client, and arranged meetings in Istanbul with the Client and World Bank authorities.

  • 34.180 km. 2×1 highway
  • 4.425 km. 2×2 highway
  • 1 Bridge (L=24 m.)
  • 44 Box Culvert (886m.)
  • 39 Pipe Culvert (1952m.)
  • Collector pipe (474 m.)
  • Guardrail (12072 m.)
  • Traffic Sign (32628 m2)

previous arrow
next arrow
previous arrownext arrow
Slider


SALAHADDIN TUNNEL & APPROACHING ROADS

Description of actual services provided in the assignment:

The project includes the Engineering & Design Works of 8.83 km highway including 2 interchanges and 2450 m. Tunnel.

  • Topographic Strip Mapping
  • The Geotechnical Study inc. Borehole Drilling and Trial Pits
  • The Highway Alignment Tunnel
  • Interchanges
  • Structural
  • Drainage
  • Traffic Signing and Marking
  • Safety Equipment
  • Electrification and Lighting. The Final Bill of Quantities
  • Unit Price Descriptions and Technical Specifications

RIzgary Interchange and Kaka ZIady Interchange on Koya Street In ErbIl

Description of actual services provided in the assignment:

The project includes the Engineering & Design Works of two interchanges and arterial road in erbil City.  Koya Street Road is designed as a 2×2 divided highway with improved capacity and physical standards to serve for the increasing traffic demand.

  • Detail Topographic Strip Mapping=29 ha.
  • Geotechnical Study incl. Borehole Drilling Trial Pits
  • Highway Alignment Design= 3.400 km.
  • 2 Interchanges
  • 1 Viaduct
  • 4 Underpass Bridges
  • Structural Design= 6537 m2
  • Drainage Design
  • Traffic Surveys & Traffic Signing and Road Marking Design
  • Landscape Design
  • Conceptual Lighting Design
  • Preperation of Bill of Quantities and Technical Specifications



ERBIL-MOSUL ENTRANCE ROAD

Description of actual services provided in the assignment:

The project includes the Engineering & Design Works of 4.9 km. of (2×2) highway. The highway corridor runs in a northeast-west direction from Erbil to Mosul.

Erbil and Mosul are the two important cities. They are highly crowded. Traffic on the road between two cities is so high.  These roads run to Kirkuk as well. The government institutions, towns and farm lands will also appreciably benefit from this road.

  • Detail Topographic Strip Mapping=130 ha.
  • Geotechnical Study incl. Borehole Drilling Trial Pits
  • Highway Alignment Design= 4.900 km.
  • 2 Interchanges
  • 1 Overpass Bridge
  • 3 Underpass Bridges
  • Structural Design= 3805 m2
  • Drainage Design Traffic Surveys & Traffic Signing and Road Marking Design
  • Landscape Design
  • Conceptual Lighting Design
  • Preperation of Bill of Quantities and Technical Specifications

SHIMIK ZERA INETRCHANGE IN DOHUK

Description of actual services provided in the assignment:

The interchange is located in Duhok City, another important city in Erbil Region. Because of the buildings around the interchange, the kind and the shape of the interchange is selected by the Client. We have brought the project to the optimum design standards, and prepared the shop drawings and cross-sections of the interchange.

  • Topographic Strip Mapping
  • The Geotechnical Study inc. Borehole Drilling and Trial Pits
  • Structural
  • Drainage
  • Traffic Signing and Marking
  • Safety Equipment
  • Electrification and Lighting Design. The Final Bill of Quantities
  • Unit Price Descriptions and Technical Specifications
previous arrow
next arrow
Slider

IRAQ / QANDEEL VIADUCT

Description of actual services provided in the assignment:

The project includes the Engineering & Design Works of 560 m. Viaduct (14 spans x 40 m.)
1.5 km. Highway design works inc.

  • Topographic Strip Mapping
  • The Geotechnical Study inc. Borehole Drilling and Trial Pits
  • The Highway Alignment
  • Tunnel
  • Interchanges
  • Structural
  • Drainage
  • Traffic Signing and Marking
  • Safety Equipment
  • Electrification and Lighting. The Final Bill of Quantities
  • Unit Price Descriptions and Technical Specifications
previous arrow
next arrow
Slider


PROJECTS IN TURKMENISTAN

TURKMENISTAN / ASKABAT CANDYBIL PROTOCOL ROAD

previous arrowprevious arrow
next arrownext arrow
Slider
Description of actual services provided in the assignment:

  • Total : 33 Km Length
  • 4 Interchanges
  • 5 Intersections
  • 12 Km Length Service Culvert
  • 6 River Bridges
  • 8 Pedestrian Underpasses
  • 16 Hydraulic Culverts

TURKMENISTAN / ASHGABAT TV TOWER ROAD (7.5 km.)

Description of actual services provided in the assignment:

  • Total : 7.5 Km Length
  • 1 Interchange
  • 1 Intersection
  • 1 Pedestrian Overpass (33.6 m.)
  • Retaining Walls
  • 34 Hydraulic Culverts

TURKMENISTAN / ASHGABAT STADIUM & BAHT KOSKU RING ROAD PROJECT

previous arrow
next arrow
Slider
Description of actual services provided in the assignment:

Conceptual & Final Design Works of 13 Km Length Road Design including

  • Drainage Design
  • Traffic & Guardrail Design
  • Landscape Design
  • Road Lighting Design


PROJECTS IN QATAR

QATAR DOHA INDUSTRIAL INTERCHANGE

Description of actual services provided in the assignment:
  • Revision of Shop Drawings
  • Preparation of As-Built
  • Cross-Section Drawings


 QATAR DOHA RAMADA INTERCHANGE

Description of actual services provided in the assignment:
  • Interchange Alternatives
  • Bridge Pier Alternatives



PROJECTS IN TURKEY

• TURKEY/AYDIN-DENIZLI MOTORWAY – DENIZLI PERIPHERAL SECTION 47 KM.

Description of actual services provided in the assignment:

Design and Preparation of the drawings for the motorway, drainage, guardrail, traffic safety, landscape works. Traffic Surveys and Feasibility Analysis for Toll System & Traffic Signing and Road Marking Design, Safety Equipment. Cartography and preparation of the standard photogrammetric map; scale 1:5000 for a site of 4770 hectares, 1:1000 for a site area of 1972 hectares. Expropriation works and preparation of the design drawings for 6 interchanges.

  • 2 river bridges (L=520m)
  • 3 viaducts (L=5858 m)
  • 26 underpass bridges
  • 11 overpass bridges
  • 112 culverts
  • 1 toll plaza
  • 1 service area

(Ankara-İzmir) JunctIon – Bursa Motorway 205 km.


Afyon – Antalya Motorway 200 km.


Urfa – Habur Motorway 410 km.


Horasan – Gurbulak Motorway 220 km.


LINK HIGHWAY BETWEEN BUCA-ONAT AND INTERCITY BUS TERMINAL AND RING ROAD IN IZMIR DETAILED DESIGN WORKS

Description of actual services provided in the assignment:

  • 7.015 km (2×3 lanes) Highway
  • 3.45 km (2×1, 2×2 Lanes) Link Road
  • 3 pieces At-grade Intersection
  • 5 pieces Interchanges
  • 1 pieces Tunnel Twin Tube; L1=2543 m., L2=2508 m.
  • 2 pieces Viaduct (20614 m²; L1=814,35m., L2=365.65 m.)
  • 3 pieces Bridge (1360 m²)
  • 1 pieces Post Tension Bridge(1798 m²),
  • 4 pieces Underpasses (2397 m²),
  • Retaining Walls (27000 m²)
  • 8 pieces (2×2, 3×2, 4×3) box culvert
previous arrow
next arrow
Shadow
Slider


ISTANBUL F1 RACING CIRCUIT

previous arrow
next arrow
Slider


TURKEY/ TOKAT/RESADIYE-16. REGION BORDER HIGHWAY

Description of actual services provided in the assignment:

The project includes the Engineering & Design Works of 24.4 km highway including 1 interchanges, 12 intersections, 1 underpass, 5 river bridges, 46 culverts, concrete walls and anchoraged slope stabilization works.

  • Topographic Strip Mapping
  • The Geotechnical Study inc. Borehole Drilling and Trial Pits
  • The Highway Alignment
  • Tunnel
  • Interchanges
  • Structural
  • Drainage
  • Traffic Signing and Marking
  • Safety Equipment
  • Electrification and Lighting
  • The Final Bill of Quantities
  • Unit Price Descriptions and Technical Specifications


Executed Works In ISTANBUL (AsIan SIde)


Executed Works In ISTANBUL (european SIde)


ISTANBUL TEMAPARK KAYABAŞI-TEM MOTORWAY INTERCHANGE AND LINK ROADS

Description of actual services provided in the assignment:

  • Total : 33 Km Length
  • 4 Interchanges
  • 5 Intersections
  • 12 Km Length Service Culvert
  • 6 River Bridges
  • 8 Pedestrian Underpasses
  • 16 Hydraulic Culverts

ISTANBUL/MALTEPE BUYUKYALI RIVER REHABILITATION & TEM-D100 HIGHWAY INTERCHANGE & LINK ROADS PROJECT


TURKEY/ UMRANIYE-SILE DIVIDED HIGHWAY PROJECT

Description of actual services provided in the assignment:

The project includes the Engineering & Design Works of 42 km highway including 3 interchanges, 8 intersections, 1 underpass, 5 river bridges, 46 culverts, concrete walls and anchoraged slope stabilization works.

  • Topographic Strip Mapping
  • The Geotechnical Study inc. Borehole Drilling and Trial Pits
  • The Highway Alignment
  • Interchanges
  • Structural
  • Drainage
  • Traffic Signing and Marking
  • Safety Equipment
  • Electrification and Lighting. The Final Bill of Quantities
  • Unit Price Descriptions and Technical Specifications



PROJECTS IN OTHER COUNTRIES

SUDAN / KHARTUM INNER RING ROAD

Description of actual services provided in the assignment:
  • Preliminary Design Works
  • 31 Km
  • 12 Interchanges
  • 8 Intersections


ROMANIA/BRASOV RING ROAD

Description of actual services provided in the assignment:
  • Preliminary Design Works
  • Three Alternative Projects
  • 30 Km
  •  Interchanges
  • 4Intersections


AZERBAIJAN / BAKU KUR RIVER BRIDGE

Description of actual services provided in the assignment:

  • Conceptual Design Works of Three Alternatives of the bridge on KUR River