Albenia Qukes - Qafe Thane Yolu(21 km.)
 
Employer: Mak-Yol Cons. & Trade Inc.

Project Date: 10.01.2001- 01.08.2001

The (2x1) lane state road with an intersection and many small structures and retaining walls. The project also includes drainage, horizontal & vertical signing and guardrail design.

Images should take a while to load Images should take a while to load
Iraq, Erbil-Altun Kopri Road (38.6 km.)
 
Employer: KRG Ministry of Construction & Housing and Directoriate of Roads –Bridges

Project Date: 20.01.2006- 20.03.2006

The rehabilitation and widening of existing (2x1) undivided 38 km. Erbil-Altunkopri Road as (2x2) lane divided highway. The road connects the biggest cities of Northern Iraq, Erbil and Kirkuk. The project includes drainage, vertical and horizontal signing and structural design.

Images should take a while to load Images should take a while to load Images should take a while to load
Gaziantep Şanlıurfa Motorway, Suruç-Şanlıurfa Section Supervision Works.
 
Employer: General Directoriate of Highways.

Project Date: 11.12.2000- Today

Images should take a while to load Images should take a while to load Images should take a while to load
D100 Adapazarı City Crossing and Arifiye Intersection
 
Employer: General Directorate of Highways, Gülsan Cons. Ltd. Co

Project Date: 01.03.1997- 15.05.1998

The widening of the existing road and designing of the interchanges and 2 river bridges. The project also includes drainage, horizontal and vertical signing and structural design.

Aydın Denizli Highway – Denizli Peripherial Motorway Section (45 Km)
 
Employer: General Directorate of Highways

Project Date: 20.02.1997- 04.04.2002

The motorway is between Aydın to Denizli. There are 4 interchanges and a service area on the route and many small structures. The project includes drainage, landscape and horizantal and vertical traffic signing & marking Design.

Images should take a while to load Images should take a while to load
Duhok Link Road (11km)
 
Employer: KRG Ministry of Construction & Housing and Directoriate of Roads –Bridges

Project Date: 24.10.2005 – 20.02.2006

This Link Road starts from Ch=112+430 of Erbil – Zakho ( Khabur ) Motorway goes to Duhok. It will be the dual 2-lane motorway. The project includes drainage,vertical and horizontal signing, guardrail and structural design.

Images should take a while to load Images should take a while to load
Erbil-Zakho(Khabur) Motorway (182 km.)
 
Employer: KRG Ministry of Construction & Housing and Directoriate of Roads –Bridges

Project Date: 28.12.2004 – 03.03.2006

Erbil – Zakho ( Khabur ) Motorway will connect Erbil to Turkey via Duhok, Zakho (Khabur). It will be the only dual 3-lane motorway crossing North Iraq in the boundaries of KRG. The project includes drainage,vertical and horizontal signing, guardrail and structural design.

Images should take a while to load Images should take a while to load Images should take a while to load Images should take a while to load Images should take a while to load Images should take a while to load Click for details...
Formula 1 IstanbulPark Racing Circuit (5.5 km)
 
Employer: FIYAS – Formula Istanbul Investment Inc. Co.

Project Date: 28.03.2003- 31.07.2005

The Racing Circuit and inner & outer roads including underpasses and many small & large structures. The project includes all infrastructure, landscape, safety design and Horizantal and vertical traffic signing & marking design.

Images should take a while to load Images should take a while to load
Formula 1 Racing Circuit TEM Underpass & Link Road (10 km)
 
Employer: FIYAS – Formula Istanbul Investment Inc. Co.

Project Date: 28.05.2003- 31.07.2005

This road connects the TEM to F1 Racing Circuit. There is an underpass on the route and many small structures. The project includes drainage and horizantal and vertical traffic signing & marking Design.

Widening of D100 between Gebze-Şirinyalı
 
Employer: 1st regional Division of Highways, Akyapı Cons.Inc. CoFIYAS – Formula Istanbul Investment Inc. Co.

Project Date: 15.12.1997-2003

The widening of D100 between Gebze-Şirinyalı project consist of intersections & interchanges and many structures. The project include drainage,vertical and horizontal signing and guardrail design.

Images should take a while to load
TEM-Güneşli Interchange and Mahmutbey Road
 
Employer: T.C Istanbul Metropolitan Municipality

Project Date: 21.10.1999-31.03.2003

The project connects Güneşli and Mahmutbey on TEM and includes signalized intersections and an interchange.It is a (2x2) lane.

Images should take a while to load
Hacıhamza-Osmancık State Highway (40 km.)
 
Employer: General Directorate of Roadways

Project Date: 25.08.2005-Today

The widening and rehabilitation of the existing road between Hacıhamza and Osmancık Highway. The project also includes drainage, horizontal and vertical signing,guardrail,landscape and structural design.

Images should take a while to load Images should take a while to load Images should take a while to load
İstanbul 1. Peripheral Motorway Haliç Bridge Ayvansaray Interchange
 
Employer: 17th regional Division of Highways, Bayındır Cons.Inc. Co

Project Date: 15.04.1996-15.08.1996

The connection of Ayvansaray side of Golden Horn Bridge and Coast Road is supplied with this Project.This project includes 3 underpasses, retaining walls and many small structures.

Images should take a while to load
Izmit D100 City Crossing
 
Employer: General Directorate of Highways, Gülsan Cons. Ltd. Co

Project Date: 01.02.1997- 17.04.1997

The widening of the existing road as (2x2) lane and re-designing of sideways. The project also includes drainage, horizontal and vertical signing,guardrail and structural design.

Söğütlüçeşme-Rıhtım-Şahapgürler Streets Elevation Rehabilitation Urban Design
 
Employer: T.C Istanbul Metropolitan Municipality,Urban Design Directorate

Project Date: 27.12.2002- 07.07.03

The elevation rehabilitation of Söğütlüçeşme-Rıhtım-Şahapgürler Streets in Kadıköy designed. The project includes the existing buildings defination with all properties like structures, storey details, colors.

Images should take a while to load Images should take a while to load Images should take a while to load
Party Building
 
Project Date: 04.12.2006– 24.01.2007

The predesign of a party Building. It has 5850 m2 of floor area on a 79.260 m2 site with 3 main blocks combined with 4 pedestrian bridges on the first floor

Images should take a while to load Images should take a while to load Images should take a while to load
Kemerburgaz Road Sewage & Drainage System. Istanbul / TURKEY
 
Project Date: 20.08.1996– 20.02.1997

The project include wastewater, stormwater and freshwater network projects. Also the inner roads are designed.

Images should take a while to load Images should take a while to load
Cyprus Nicosia (Ercan Airport)- Fagamusta Highwaay(55 Km)
 
Employer: General Directoriate of Highways.

Project Date:27.03.1998- 03.04.2001

The road between Ercan Airport -Lefkoşa-Gazimagosa converted to (2x2) lane divided road with interchanges and city crossing . The project also includes structural design.

Images should take a while to load Images should take a while to load Images should take a while to load Images should take a while to load Images should take a while to load Images should take a while to load Images should take a while to load Images should take a while to load
Iraq Kora-Shaqlawa-Qandeel State Highway (45 km.)
 
Employer: KRG Ministry of Construction & Housing and Directoriate of Roads –Bridges

Project Date: 26.07.2006- 26.09.2006

The (2x2) lane highway is connecting; Erbil, Selahaddin, Kore, Shaqlawa, Mirawa, Sisâwa, and most importantly firstly the Northwestern cities over the Qandeel bridge and secondly Northeastern cities across the Chiya-i Harir Mountain ranges. The project includes drainage, vertical and horizontal signing and structural design.

Images should take a while to load Images should take a while to load
İstanbul D100 Harem – Küçükyalı Expressway and Interchanges (12 km.)
 
Employer: General Directorate of Highways, Gülsan Cons. Ltd. Co

Project Date: 01.11.1996-25.06.1998

The widening of the existing road and designing of the interchanges & intersections and side roads between Harem and Küçükyalı . The project also includes drainage, and small structure design.

Images should take a while to load Images should take a while to load Images should take a while to load
Link Motorway Project to Olimpic Complex -iSTANBUL
 
Employer: General Directorate of Highways, 17th Regional Directorate

Project Date: 21.10.1999-31.03.2003

The project includes all Link Roads to Atatürk Olimpic Complex. There are 9 interchange and many small structures.The project includes drainage, horizontal and vertical signing, guardrail design and Ayamama River Diversion project.

Images should take a while to load Images should take a while to load
Pendik Kaynarca Intersection and TCDD Underpass Widening Construction
 
Employer:T.C Istanbul Metropolitan Municipality, Taşyapi Cons. Ltd. Co, U.N Ro-Ro Inc. Co.

Project Date: 03.02.2003-03.03.2003

The road connecting the coastway to D100 is designed. The project also include drainage ,horizontal and vertical traffic signing and sutructural design. There is an important DDY underpass and viaduct are included in this project.

Qandeel Viaduct & Road Project - Iraq
 
Employer: KRG Ministry of Construction & Housing and Directoriate of Roads –Bridges

Project Date:15.03.2005-30.04.2005

Final design of (2x2) highway project including lighting and structural projects.

Rezzan Viaduct & Road Project - Iraq
 
Employer: KRG Ministry of Construction & Housing and Directoriate of Roads –Bridges

Project Date: 01.06.2005- 01.07.2005

Final design of (2x2) highway project and structural projects.

Rize, Güneysu Pedestrian Bridge
 
Project Date: 10.01.2005– 08.02.2005

The final design of pedestrian bridge and its structural project.

Images should take a while to load Images should take a while to load
Romania Brasov Ring Road (25 km.)
 
Employer: Brasov Country Council

Project Date: 2002

The Predesign of (2x2) lane periherial highway of Brasov.

Images should take a while to load Images should take a while to load
Özdemir Sabancı Organized Industrial Zone Water Reservoir.
 
Project Date: 20.08.1996– 20.02.1997

The project include wastewater, stormwater and freshwater network projects. Also the inner roads are designed.

Images should take a while to load Images should take a while to load
Kurtköy - Sabiha Gökçen Airport Motorway Link Road & Interchanges (15 km)
 
Employer: General Directorate of Highways, Orhan Evin Construction Incorporated Company.

Project Date: 03.06.1998-30.06.2000

The connection road between TEM Kurtköy Intersection-E5 Road Pendik Shipyard Intersection and Sabiha Gökçen International Airport Connection Road and Intersections.This project İncludes 6 intersection, an interchange and many small structures.

Images should take a while to load
Gaziantep Şahinbey Municipality I. & II. Level; Final Infrastructure Projects...
 
Employer: Gaziantep Şahinbey Municipality, Katılım Inc.

Project Date: 05.10.1994- 22.04.1995

All infrasucture projects including fresh water, Sewerage, drainage, electrical and telecomunication design.

Images should take a while to load
Ümraniye(İstanbul) – Şile Highway (42 km.)
 
Employer: General Directorate of Highways, Bal-İş Con. Inc. Co.

Project Date: 26.05.2004-Today

The widening of the existing road between Ümraniye and Şile Highway. The project also includes structural design.

Images should take a while to load Images should take a while to load Images should take a while to load
Sudan Khartoum Inner Ring Road (45 km.)
 
Employer: Ministry of Transportation, Dar-Consult Development Consulting Authority.

Project Date: 2002

The Preliminary Design of (2x2) lane inner ring road.

Images should take a while to load Images should take a while to load
Iraq Süleymaniyah – Arbat Highway (20 km.)
 
Employer: Gunesyol Inc. Co.

Project Date: 02.08.2004- 10.10.2004

The (2x2) lane highway is connecting; Suleymaniyah to Arbat.

Tesco Kipa Stores Traffic & Feasibility Studies
 
Employer: Tesco Kipa Stores

Project Date: 21.01.2004- 03.06.2005

The traffic & feasibility projects are prepared for various sites in Turkey . Some major places are; İstanbul, İzmit, Muğla, Denizli, Çanakkale,Uşak, Afyon, Ankara, İzmir, Antalya.These reports include transportation,infrastructure, route alternatives.

Images should take a while to load Images should take a while to load Images should take a while to load
Trabzon Yomra Seperation – Özdil Highway (23 km.)
 
Employer: General Directorate of Highways, 10th Directorate of Highways.

Project Date: 05.10.2001-28.03.2004

The widening & rehabilitation of the existing road between Yomra and Özdil. The project also includes structural design.

Alexandria Troas Nature Villas, Çanakkale
 
Employer: KRG Ministry of Construction & Housing and Directoriate of Roads –Bridges

Project Date: 12.2006– 24.01.2007

Alexandria Troas Nature Villas project include 18 villas and these are 2 types, 14 of them are 2 storied and 4 of them are 3 storied villas. All off them have sea sight.

Images should take a while to load